⎝⎛中国足彩app⎞⎠

    • :0371-67391059 67391089 Phone : 0371-67391059 67391089
    • :hnfjd@163.com email : hnfjd@163.com
    • :13938555219 13526450988 Mobile : 13938552519 13526450988
    • :国家郑州经济技术开发区(航海东路) Address : National Zhengzhou Economic and Technological Development Zone (Hanghai East Road)
    您当前的位置: 首页> 最新动态 Latest NewsYour current location: ⎝⎛中国足彩app⎞⎠> News
    Problems still existing in the construction of network rooms
    Tianchi anti-static floor , computer room wall panel theory-problems that still exist in the construction of network room Before analyzing the future development trend of the computer room, let's first look at the problems existing in the domestic room construction. At present, the design and operation management of most domestic computer rooms are relatively backward, with insufficient systemicity, availability, and scalability, and they are disconnected from the trend of IT equipment racking. There are major security risks that seriously affect the function. Users who do not pay much attention to expandability often do not consider whether new servers will be added in the future when they build a computer room. This will eventually lead to a large problem in the power distribution in the cabinet when the system is expanded. There are hidden dangers in the safety of the wiring board and cables. Disconnected from the trend of IT equipment racking, users tend to ignore the air distribution problem in the cabinet. When the computer room is completed, there are widespread local hotspots. Due to unreasonable design and maintenance, most machine rooms are under negative pressure on the outside of the machine room during operation, which causes the dust cleanliness in the machine room to exceed the standard. The domestic experts behind planning, design and operation management are summarized as first-class equipment, second-class design, and third-class management. First-class equipment refers to the equipment in the computer room, including UPS, which are the most advanced in the world. Second-class design refers to the backward design and planning of the computer room. Third-rate management means that the management of the computer room after construction is very difficult. The reason for this result is that domestic users have not paid enough attention to the construction of computer room facilities. The system of the computer room is not high. The entire system of the computer room should be designed in a balanced manner. One part should not be too good, while the other part is relatively poor. Factors affecting the availability of the computer room include power supply systems, air conditioning systems, monitoring systems, and rack systems. Domestic users have more or less problems in the planning and design of equipment rooms, equipment selection, construction and installation, operation and maintenance.
    Zhengzhou Tianchi Anti-static Floor Co., Ltd.Tel:0371-55957565 email: 13938555219@163.com Mobile phone: 13938555219 13526450988 Address: National Zhengzhou Economic and Technological Development Zone (Baisha Industrial Park) Tianchi official website: xxmnls.com Static floor, machine room wallboard, machine room ceiling, static grounding, the first choice for modern modular machine room decoration! Tianchi anti-static floor warm reminder: Anti-static floor must be grounded!
    Zhengzhou anti-static floor, computer room wall panel manufacturer Shanton UPS power supply Shenzhen conductive cloth Henan anti-static floor, computer room wall panel manufacturer Ministry of Industry and Information Technology website anti-static floor manufacturer Baidu search
    Copyright Zhengzhou Tianchi Anti-static Floor Co., Ltd.Tel: 0371-55957565 After-sales service Tel: 13526450988 13938555219
    email: 13938555219@163.com Mobile: 13526450988 Address: National Zhengzhou Economic and Technological Development Zone (Baisha Industrial Park) Yu ICP No. 12005354
    真人游戏平台注册 欢乐拼三张 七乐彩 欢乐拼三张